Cutting lead times and providing cost saving alternatives for local asphalt plant

A local asphalt plant who are in the mining and quarrying industry were replacing their bearing units every 8-10 months due to the harsh conditions, meaning they were frequently having to shut down machinery for maintenance causing unnecessary downtime and loss of production.

After careful analysis and discussions with their local branch manager, Accorn and the local asphalt plant determined that their best option would be to swap out their current units for the Timken Type-E TRB Housed Units. The plant had previous experience with Timken units which were still running 3+ years after fitting, and were delighted to find ACORN® could provide Type-E units same-day from stock. With 3x greater misalignment capability and 12% higher load carrying capacity, the Type-E housings will offer superior performance and vastly reduced downtime through their life span.

This solution and application by Acorn allowed for the local asphalt plant to reduce their maintenance costs, lower their maintenance time and further increase their production.

To find out more information get in contact with Acorn Industrial Services Ltd today!

Source: Acorn Industrial Services Ltd

Leave a Reply